Show phone

Knowledge base

How to read a carrier's quote: what the rate covers and what costs extra

Two offers for the same route can differ not in price but in content. We explain the difference between an all-in rate and a base with surcharges, and which items to check before comparing figures: waiting time, redelivery, pallets, customs.

You read a carrier's quote by its content, not its figure. Check whether the rate is all-in or a base with surcharges, whether it covers customs clearance on both sides, how many hours of loading and unloading are included, what a second delivery attempt costs and how pallet exchange is settled. Only then does comparing two offers make sense.

What should a good quote contain?

A complete offer for a Poland to UK route describes at least: the route with postcodes, the type and quantity of cargo, the schedule, the freight amount and the list of services that amount covers. Our standard is one rate covering carriage, the crossing and clearance on both sides; if something needs a surcharge, we say so before the order is confirmed. On the market you will meet different conventions, and none is wrong by definition, as long as you know what you are reading.

All-in or base plus surcharges?

An all-in rate is one figure for the whole service: easy to compare and to budget. The base-plus-surcharges model splits the price into freight and variable components: a fuel surcharge, tolls, the crossing, sometimes clearance. The model itself says nothing about honesty, but it demands attention: an offer with a low base and a long surcharge list can only be compared with an all-in rate after summing every item for your specific load. Where those components come from is covered in our article on what builds the price of pallet transport to England.

Items worth asking about

  • Customs clearance. Are export and import entries included or billed separately? Who prepares the declarations and what do they need from you? The document practice is described in transport to England step by step.
  • Waiting time. How many hours of loading and unloading sit inside the rate, and what each further hour of the truck waiting costs.
  • Second delivery attempt. What happens when the consignee cannot take the goods at the agreed time: the cost of a repeat approach, storage and a new booking.
  • Pallet exchange. Are EUR pallets swapped at delivery, or do they return on a separate order, and who carries that cost.
  • Fuel and road surcharges. Fixed at the moment of the offer, or indexed on the loading day.
  • Insurance. What carrier liability applies within the price and when extra cargo cover is worth buying; more in our article on when to add cargo insurance for the UK.

How do you compare two offers step by step?

  1. Bring both to the same scope: add to each the items the other side does not include.
  2. Total each for your scenario: with clearance, realistic loading time and pallet returns if you need them.
  3. Check the boundary terms: waiting charges, redelivery, order cancellation.
  4. Line up the schedules: a lower figure with a longer or non-committed transit is a different service, not the same one cheaper.
  5. Only after these four steps compare the figures.

Warning signs in a quote

Caution is justified when an offer does not mention customs at all, when an item called other charges appears without definition, when the rate is valid for only a few hours with no stated reason, or when the carrier cannot say who will handle the UK import entry. The full list of questions to ask before a first order is in our guide how to choose a UK carrier.

From quote to order: what else should you read?

A quote is an offer; the transport order is the contract, and only the contract binds both sides. Before signing, check that the order repeats the quoted terms: the same amount, the same service scope, the same dates. A gap between a promising offer and an order with different wording is the classic mechanism of transport disputes. Watch three fields in particular: payment terms with currency and any documents the invoice depends on; liability, which should name carriage under the CMR Convention and, for high-value goods, extra insurance; and the operational data, from loading contacts to booking references. It is also worth asking who physically performs the carriage: some market players resell freight to exchange subcontractors, and then the offer describes someone else's service. With us the cargo rides our own fleet, and that shows in every line of the offer.

Want to see what a complete offer for your load looks like? Send the data through the quote form and you will get a rate with a clear description of what it covers and the terms for waiting and booking.

Frequently asked questions

What does an all-in rate mean in UK transport?
It is one figure covering the whole service: carriage, the crossing, surcharges and usually customs clearance. Its opposite is the base-plus-surcharges model, where freight and variable components are billed separately. Before comparing offers, bring both to the same scope.
What is a waiting charge and when do you pay it?
A waiting charge covers the vehicle's time beyond the loading or unloading hours included in the rate. You pay it when the truck waits through the shipper's or consignee's fault, for example for unprepared goods. A good quote states the hour limit and the excess rate openly.
Should customs clearance be included in the transport price?
It does not have to be, but it must be clearly described: either inside the rate or as a separate item with a firm amount. With us one team runs clearance on both sides as part of the service. A warning sign is an offer that does not mention customs at all.

Need transport to the UK or customs clearance?

Tell us what you need: a person replies, not a bot. Operations team available 24/7.

Detailed quote ›